Production Losses from Prolonged Gas Line Depressurization Events
We are seeking innovative technologies or methods to reduce or eliminate the need for complete shutdown and depressurization/pressurization cycles of gas lift (GL) lines and towers during rig or barge operations in offshore fields. The current process is time-consuming and leads to significant production loss due to lengthy depressurization and re-pressurization. Our goal is either to avoid this cycle altogether or shorten the shutdown duration from days to hours. Areas of interest include:
- Advanced pipeline isolation technology, such as smart or remotely controlled plugging tools that enable localized depressurization while maintaining system pressure.
- Enhanced safety barriers or control systems, like improved Safety Instrumented Systems (SIS), to manage risks without full shutdowns.
- New offshore installation or heavy lift methods that lessen safety risks near tower structures.
Submit Solution or Join the Discussion!
Are you a solution provider and have a solution? Share your solution directly with the challenge owner.
TechnologyCatalogue.com is providing this as a service to the challenge owner, there are no fees/commission payments for solutions submitted.
Are you an end-user or technical expert and have dealt with the same challenge or would like to connect with the challenge owner? Respond to the challenge here or ask your queries to get in touch with the challenge owner to share experiences!